TITLE: | Internal Network Reconstruction Study, Wastewater Adduction Works and Wastewater Treatment Plant (WWTP) of St. George Settlement |
NAME OF CLIENT: | Municipality of Livadia |
TYPE OF SERVICES PROVIDED: | Plumbing & E / M Preliminary Wastewater Networks Study, Preliminary WWTP Study (Hydraulic, E / M, Chemotechnical), Final Wastewater Networks Hydraulic Study |
NAME OF LEGAL ENTITY: | HYDROMENT – ENGINEERING CONSULTANTS S.A. |
PROJECT CONSTRUCTION CONTRACTOR: | |
DATES (START): | 2014 |
DATES (END): | 2015 |
PLACE: | Municipality of Livadia, Viotia Prefecture |
DETAILED DESCRIPTION OF PROJECT: | Part 1: Internal Sewerage Network and Supply Pipe The proposed internal sewer network for St. George settlement, has a total gravity pipe length of about 16,4 km. Part 2: Wastewater Treatment Plant |