TITLE: | Rehabilitation – Extension of Kalamata WWTP |
NAME OF CLIENT: | DEYA KALAMATA |
TYPE OF SERVICES PROVIDED: | Final Study and Application Study for the constructing company “MESOGIOS S.A.” |
NAME OF LEGAL ENTITY: | KARAGIANNIS STAVROS – HYDROMENT ENGINEERING CONSULTANTS S.A. – EPEM S.A. ENVIRONMENTAL PLANNING AND MANAGEMENT |
PROJECT CONSTRUCTION CONTRACTOR: | MESOGIOS S.A. |
DATES (START): | 2012 |
DATES (END): | 2014 |
PLACE: | Municipality of Kalamata, Prefecture of Messinia |
DETAILED DESCRIPTION OF PROJECT: | The project involves the design, construction and operation of the project of upgrading and extending the existing WWTP of Kalamata. The design flow of the facility is 14.400 m3 / day during the winter and 19.200 m3 / day during the summer. Population equivalent is 90,000 inhabitants in the winter and 120.000 in the summer. Prepared the entire final and application study of the project. |